| 082/2001 | 03/23/01 | 19:30 - HV shutdown for semi-annual spacecraft flip. |
| 091/2001 | 04/01/01 | 21:00 - HV ramp. |
| 257/2001 | 09/14/01 | 12:20 - high and low voltage shutdown for semi-annual spacecraft flip and fall eclipse season. |
| 281/2001 | 10/08/01 | 15:18 - HV ramp. |
| 321/2001 | 11/17/01 | 18:55 - HV shutdown for Leonid Meteor Shower. |
| 323/2001 | 11/19/01 | 20:23 - HV ramp. |
| 324/2001 | 11/20/01 | Radiation Belt L-Shell Cutoffs set to 4 (np-eq), 4 (eq-sp), 6 (sp-eq), 7 (eq-np). |
Last Updated: September 2003