TIDE Operations History - 2001

082/2001 03/23/01 19:30 - HV shutdown for semi-annual spacecraft flip.
091/2001 04/01/01 21:00 - HV ramp.
257/2001 09/14/01 12:20 - high and low voltage shutdown for semi-annual spacecraft flip and fall eclipse season.
281/2001 10/08/01 15:18 - HV ramp.
321/2001 11/17/01 18:55 - HV shutdown for Leonid Meteor Shower.
323/2001 11/19/01 20:23 - HV ramp.
324/2001 11/20/01 Radiation Belt L-Shell Cutoffs set to 4 (np-eq), 4 (eq-sp), 6 (sp-eq), 7 (eq-np).

Last Updated: September 2003