Due to low spacecraft voltages, there was a loadshed on Polar on 01/24/08. All instruments were shut off. TIDE was shut off at 05:00. TIDE was turned on 01/26/08 from 13:34 to 14:51 UT.
The final Polar Spacecraft maneuver was started on February 11. TIDE high voltage was turned off at 15:30 on 02/11/08. Polar ran out of fuel during the flip. The last hydrazine maneuver was at 13:40 on 02/13. The last helium thrust was run on 02/20. TIDE HV will be ramped as soon as spacecraft maneuvers are complete and we feel comfortable with the new orbit data.
A PSI gas flow test was run on 02/13/08. After loading software patches, PSI was turned on and the gas valve opened. The valve was closed 25 minutes later. PSI was turned off once the low gas pressure dropped to zero. Low gas pressure data from the test is in tideteam/psi_ops/2008feb.
Nothing to report.